S-55 Bridge Replacement over Twelve Mile Creek

Project Description:

Carolina TEA is leading the design of a bridge replacement project. Backwater from the Catawba River floods the subject project at frequent intervals – so improving the roadway approaches to above the design year event has become critical to the project. The bridge replacement will elevate the roadway approximately 15 ft across the floodway. The existing 230 ft 5-span bridge will be replaced with a 400 ft 4-span structure.

An at-grade CSX Railroad crossing may be improved as part of the project. Ingress and egress to existing homes and businesses, including an industrial recycling center, will be maintained throughout construction. The project will be developed as an off-alignment bridge replacement, allowing the project to be completed with only a 3-month roadway closure.

Location: Lancaster County, SC

Client: SCDOT

Cost: $15million

Project Manager: Derek Staton, PE

Completion: Ongoing

Design Disciplines: Project Management, Bridge Design/Structures, Roadway Structures, Construction Services

Previous
Previous

Emergency Bridge Package 2018-2A

Next
Next

S-349 Bridge Replacement over Sandy Branch